1261 projects were found
Project image

FOR 2863: MEtrology for TERAhertz COMmunication (Meteracom)

For the advance of THz communication systems, the capability to perform precise measurements is crucial. Metrology at THz frequencies is however still in its infancy and as of today it only covers detector calibration for characterization of ultrafast devices and measurement uncertainty analysis of different spectrometer types available at THz ...

Duration: 01/2019 - 12/2024

Spectral correspondences for negatively curved Riemannian locally symmetric spaces

The central goal of this project is to describe Pollicott-Ruelle resonances of locally symmetric spaces using a - to be established - correspondence between these resonances and quantum resonances.There are close connections between the dynamical properties of a free particle on a negatively curved Riemannian locally symmetric space in the ...

Duration: 01/2019 - 12/2023

Multifunctional, active and nonlinear optical smart metasurfaces

Smart planar systems that can perform a number of concurrent tasks and actively control the linear and nonlinear optical response with compact footprint are highly on-demand in current optics and nanophotonics research. The proposed project will build on recent developments in the field of optical metasurfaces. Such metasurfaces are assembled ...

Duration: 01/2019 - 12/2022

Project image

ORCA: Crawler Analysis Benchmark for Data Web Crawlers

Duration: 01/2019 - 12/2024

Project image

Datengestützte Retrofit- und Generationenplanung im Maschinen- und Anlagenbau

Ziel des Forschungsprojekts DizRuPt war die Entwicklung eines Instrumentariums, das insbesondere für KMU Methoden und Werkzeuge erarbeitet, die eine datengestützte Retrofit- und Generationenplanung erm?glichen. Bereits w?hrend der Projektlaufzeit wurde das Instrumentarium, bestehend aus Leitf?den und prototypischen IT-Werkzeugen, frühzeitig über ...

Duration: 01/2019 - 06/2022

Contact: Dr. Christian Koldewey

TRR 285 - Subproject A03

Duration: 01/2019 - 06/2027

TRR 285 - Subproject A04

Duration: 01/2019 - 06/2027

TRR 285 - Subproject A05

Duration: 01/2019 - 06/2027

TRR 285 - Subproject B02

Duration: 01/2019 - 06/2027

TRR 285 - Subproject B03

Duration: 01/2019 - 06/2027